One drawing that ties every zone, phase and budget together, for sites too large to build in a single season.
Large sites are rarely built at once. They are built in phases, often across years, often by different contractors. Without a master plan each phase quietly contradicts the last, and by the third one nobody can say what the finished thing was supposed to look like.
What a master plan settles
- Zoning: what each part of the site is for, and how people move between them
- Phasing, with each phase usable on its own rather than a building site until the end
- Tree positions fixed early, because they are the one element that cannot be moved later
- Services routes, so irrigation and lighting are not cut into finished paving
Used on resorts, campuses, factory grounds and housing schemes. The plan is the reference every later drawing is checked against.